07:42 on a Tuesday. An engineer phones in a burst pipe. Watch the next 93 minutes travel through the whole platform: correlation, parallel action, human approval gates, a few curve balls, and the signed audit trail that captures all of it. Press play; narration is on by default.

1
2
3
WhatsApp broadcast to 14 zone workers DELIVERED 14/14
APPROVED & SENT
Control room · work instruction OPERATOR STATION 2 · PLANT 2
ISOLATE & LOCK OUT — PL2-SLR-104
ISOLATION POINTV-217 — Bay 4 branch (upstream)
SCOPEBay 4 only — Bays 3 & 5 remain in service
RAISED BYNexusCore · incident INC-2481
AUTHORISED BYR. Botha (Site Manager) · 07:45:20 · signed
PERMITPTW-7723
Close V-217, confirm zero flow downstream
Apply lock and danger tag at V-217
Sound Bay 4 evacuation, confirm zone clear
Awaiting operator Executed by the operator on the plant’s own system. Asterion issues the instruction. It does not actuate.
Calling… SiteComm → R. Botha (Site Manager) 07:44:05
AssetVaultSite layout
Admin & Gate Plant 1 — Crushing Plant 2 — Milling ◀ incident located Plant 3 — Flotation Workshops Reagent Store Tailings Dam Water Treatment Bay 1 Bay 2 Bay 3 Bay 4 ◀ INC-2481 Bay 5 Bay 6 MCC Room electrical — at risk west drainage channel BAY 4 — REGISTERED ASSETS Ball Mill 04 Slurry Pump PU-412 Cyclone Cluster CY-208 ✱ failure PL2-SLR-104 ASSET RECORD CodePL2-SLR-104 TypeSlurry transfer line CriticalityHIGH Installed2025-06-03 ContractCTR-0892 Weld batchWB-2025-114 Upstream iso.V-217 P&IDPID-P2-B4-03 PLANT / OT · LEVEL 2 HISTORIAN · LEVEL 3 iDMZ · LEVEL 3.5 AI ASTERION DCS ABB 800xA Siemens PCS 7 Foxboro / EcoStruxure Yokogawa CENTUM never touched HISTORIAN AVEVA PI System or DCS historian stays the system of record ASTERION COLLECTOR read-only · outbound only store & forward runs in the customer’s own network SQL · OPC UA · PI Web API MODULES AssetVault metrics · thresholds ReliCore failures · run hours TLS ✕ NO WRITE PATH · NO INBOUND A read-only second channel — the pattern NAMUR standardised (NE 175 / NOA). Asterion never writes to a control system. Alarm and trip limits already configured by the plant’s engineers are imported as-is — the thresholds stay theirs. PL2-SLR-104 — DISCHARGE PRESSURE (bar) 840 low-pressure alarm 3.0 07:38:12 — breach ← 94 seconds → 07:36 07:40 CASCADE PRESSURE LOW ReliCore · 6.8 → 2.6 bar FLOW HIGH ReliCore · +11% vs setpoint SUMP LEVEL RISING AssetVault · 3.2× baseline HUMIDITY — MCC-034 SHREQ360 · above alarm point Four independent signals. One signature: loss of containment. Thickener feed V-201 isolates Bays 3–5 ✗ too broad Bay 3 Bay 5 V-217 ✓ nearest upstream · Bay 4 only ✱ failure point V-233 downstream of failure ✗ no isolating effect
AWAITING APPROVAL

93 minutes.
1 phone call in · 31 actions · 4 human approvals
0 emails hunted · 0 spreadsheets opened · 0 steps forgotten

Every decision on a signed, append-only ledger, replayable for the regulator, the insurer, and the board.
This is what "Stop managing systems. Start running operations." means.

Talk to us Explore the modules

SIGNED AUDIT LEDGER — LIVE

CHAPTER 1 — THE CALL

Press play to begin

A burst pipe at Plant 2 is about to travel through twelve modules, four approval gates, and one very long audit ledger.

The scenario is illustrative. Names, organisations, asset codes and contract references are fictitious. The site-manager call is a genuine SiteComm voice conversation, recorded and transcribed by the platform itself. Imagery and narration produced with AsterForge, the AI Asterion content studio.

© 2026 AI Asterion